Real Project Management Is the Only Way

Problem Description

In the UK, according to many respected surveys approximately two-thirds of major IT projects fail to deliver some of their key objectives on quality, timescale and budget. More than a quarter of the projects fail completely. The overwhelming evidence clearly indicates that technology is NOT the most important failure factor. Instead the real stumbling blocks are found within the Project Processes in particular ineffective Project Management.

Unrealistic time-budget estimates, poorly defined objectives, lack of visible-measurable quality controls and uncontrolled changing requirements are the main contributory factors in failure of many IT projects. Obviously the on going increased sophistication in software technologies and methodologies (e.g. OO, RAD, XP and etc) have not been effective in producing more successful projects. In fact it can easily be argued that because of prevailing weak management, the increasingly technological complexity has often become another negative factor leading to skill shortages, spiralling development costs and proliferation of unreliable systems.

 

Solution

Simply the answer lies in adopting robust and standardised Project Management with strong and continuous emphasis on Quality Control throughout the project lifecycle.

 

Our Approach

aIncorporate visible and cost effective Quality Control gates between each of the project phases:

Initiation->Specification->Design->Build->Installation->Operation

aWork within a systematic Management Framework: Monitoring, Reporting, Escalation Route, Risk Management, Problem Detection and Controlled Changes.

aContinuous verification of project status against the authorised Business Case and the agreed Objectives of the project.

aAdoption of proven Quality Standards (e.g. ISO9000) and Management Methodologies (e.g. PRINCE2) at all stages.

aPragmatic Approach toward the use of IT Technologies and Methods.

aImplement only what is required and compliant to the required Quality.

 

$        Many Organisations and Managers are Capable of Reciting the Above

$        But In Practice Many Only Pay Lip Service And Have Weak Project Management

 

* We Simply don’t Know How Else to Manage a Project Successfully

 Without ACTUALLY Applying the Above

 